Why I Support Right-sizing Boulder Streets with Living Laboratory

Boulder’s debate on reconfiguring its streets centers around how we use our scarcest resource – land – for transportation. We need a just transportation system that gives equal opportunity to all users regardless of wealth, age, or physical ability. I’m writing in support of right-sizing all four streets in Phase 2 of Living Labs.

Comments on the particular corridor plans:

Folsom Street / Iris Avenue:
As higher-trafficked corridors, both streets represent a challenge to right-size. However, Folsom and Iris also show the most benefit as central arterial roads in Boulder which function with few or no other direct routes to use on a bicycle. A right-sized Folsom could become easily the best north-south bicycle route in the city and a beautiful street.

Looking at the analysis for each corridor, I believe the staff recommendations are appropriate: to maintain both turn lanes at Iris/Broadway, and provide a limited treatment on Folsom between Canyon and Arapahoe. If the Living Laboratory project on Folsom is successful, I’d like to see further discussion on how capital projects may improve the corridor between Canyon and Arapahoe.

20150606_145444
55th street off-peak (Saturday June 6th around 2:30PM).

63rd Street / 55th Street:
63rd Street through Gunbarrel and 55th Street through East Boulder are a different usage case than Folsom/Iris, as each traverse industrial/office park zoned areas, but are quite similar themselves. Both have substantial (but workable to right-size) peak-hour automobile traffic, but very low off-peak and weekend automobile traffic. Please see my attached photos/links of each corridor below, taken on Saturday June 6th around 2:30PM. At this time, the cars in view were approximately equivalent to the number of lanes (only 3 to 5 on the entire stretch of the corridor), which suggests highly overbuilt roads on these corridors a majority of the time.

20150606_143714
63rd street off-peak (Saturday June 6th around 2:30PM).

For 55th street particularly, I have read the many concerned letters from the TAB packet which center around the train crossing. A train crosses 4-6 times per day, occasionally falling during peak periods. Many drivers understandably complain about the delay when a train passes and fear that right-sizing the corridor would make the delay worse.

But the crux of complaints are due to waiting for the train itself, which is separate from right-sizing. Yes, right-sizing will marginally increase the amount of wait time due to a train crossing. But the delay will still be primarily due to the train, not a change in the street configuration. Let’s not forego ways to make great streets by only designing for peak periods, and let’s not forego even the *testing* of this project for a rare occurrence.

We cannot build successful streets by compromising their design to address an edge case (train crossing) of an edge case (peak-hour traffic). Right-sizing these streets now will help steer a walkable, bikeable vision for these corridors into the future.

Final Thoughts

Based on the analysis from staff, I urge the Transportation Advisory Board and City Council to move ahead with right-sizing on all of the proposed streets. We need to re-emphasize that these are pilot projects, and readily embrace public feedback to continue improving these streets over time.

We need right-sizing projects in order to build a functional on-street bike grid covering the city. These four corridors will provide a great base from which to build an on-street system with powerful network effects: the more streets we can connect, the more useful the system becomes for the typical person.

Right-sizing is critical for the city to extend beyond Boulder’s current plateau as a “confident cyclist” bike city; we can no longer rely only on indirect routes or multi-use paths to get us there. And if successful, we may even reduce the current load on our path system to allow slower, more leisurely purposes while the on-street bike network functions as designed – to efficiently and safely move people where they need to go.

I leave you with this image and quote:
https://twitter.com/fietsprofessor/status/603134652946194432

One thought on “Why I Support Right-sizing Boulder Streets with Living Laboratory

  1. I would love to start a petition to bring back right-sizing to Iris Ave. I was anxiously awaiting it’s arrival, and was so disappointed when the project was scrapped. Do you have any advice on how to go about doing it? Would love to get a group of people working together on this.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s